Technology Building in Leuven / de Jong Gortemaker Algra Architects

Technology Building in Leuven  / de Jong Gortemaker Algra Architects - Image 2 of 23Technology Building in Leuven  / de Jong Gortemaker Algra Architects - FacadeTechnology Building in Leuven  / de Jong Gortemaker Algra Architects - Beam, Facade, Steel, HandrailTechnology Building in Leuven  / de Jong Gortemaker Algra Architects - Windows, FacadeTechnology Building in Leuven  / de Jong Gortemaker Algra Architects - More Images+ 18

  • Architect In Charge: THV Ar-Te, de Jong Gortemaker Algra, STABO
  • Colaborators: Maurits Algra, Tycho Saariste, Iwein Meyskens
  • Client: University Hospitals Leuven
  • City: Leuven
  • Country: Belgium
More SpecsLess Specs
Technology Building in Leuven  / de Jong Gortemaker Algra Architects - Facade
© Toon Grobet

The new building on the edge of the university campus is not merely a functional building one has to accept, and certainly not an unavoidable intrusion either. Indeed, it enhances the visual appeal of the quarter and accommodates, on some 6000 square metres floor area, the quarter’s energy and data centre. For functional reasons the three-storey building is all but opaque. There are numerous ventilation openings but few places that could be glazed, such as the two staircases on either of the narrow sides and an area on the first floor.

Technology Building in Leuven  / de Jong Gortemaker Algra Architects - Facade, Windows
© Marcel Van Coile

From the first floor upwards, perimeter walls are closed with externally insulated precast concrete components. The thermally insulated panels are finished with black acrylic lining. In front of those, an aluminium subframe supports 600 millimetre deep fibre cement vanes. The secondary façade serves as an additional layer of thermal protection and a shield from rainwater and sunlight. Just as importantly though, and given its form and colour, it is the material that lends the building’s exterior its attractive appearance. The vanes in front of the closed exterior walls have been mounted at a pitch of 30 degrees from the vertical. In frontal view and from a distance the façades therefore appear opaque, displaying a distinct horizontal structure. Viewed at an angle, the vanes seem to converge towards a distant vanishing point. In close-up view the appearance changes yet again as the gaps between the vanes towards the top of the building become seemingly wider.

Section AA

Vanes in front of glazed wall sections have a 60 degree pitch, proffering yet another façade pattern that changes during a 24 hour cycle: during the day it presents more of a dark background, but when lit from behind these surfaces become quite bright.

Source project description: A+D Architecture + Detail No 41, Karl Kraemer Verlag Stuttgart, 2013

Project gallery

See allShow less

Project location

Address:Herestraat 49, 3000 Leuven, Belgium

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Technology Building in Leuven / de Jong Gortemaker Algra Architects" 10 Dec 2013. ArchDaily. Accessed . <https://www.archdaily.com/456140/technology-building-in-leuven-thv-ar-te-de-jong-gortemaker-algra-stabo-architecten> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.