The new building as part of the Palmer Museum of Art at Penn State is set to open its doors on June 1, 2024. The new 6,600 sqm building is situated in The Arboretum at Penn State, intended to enhance accessibility and offer a new range of amenities while doubling the space of the current gallery to host a growing collection of more than 10,000 pieces. Designed by Allied Works and landscape architect Reed Hilderbrand, the new space features 20 art galleries, improved educational and event spaces, a museum store, a café, a sculpture path, and outdoor terraces.
Penn State: The Latest Architecture and News
Palmer Museum Building: Set to Open on the 1st of June 2024 in Pennsylvania
Expansion of the Palmer Museum by Allied Works Breaks Ground at Penn State
The construction of the new building of Palmer Museum has begun. Located at Penn State, USA, and scheduled to open in the spring of 2024, the new 6600 square meters complex will expand nearly double the space of the current gallery to host the growing collection of more than 10,000 pieces. The design features a series of pavilions, educational areas, and courtyards to boost accessibility to the art collections for students, staff, and the public. The construction aligns with the 50th anniversary of the museum along with a multitude of events, including the exhibition of Allied Works' pieces of the design process for the new Palmer Museum.
Foster + Partners and Branch Technology Win Phase 2 of NASA's 3D-Printed Habitat Challenge
The team of Foster + Partners and Branch Technology have been awarded first prize in the latest stage of NASA’s 3D-Printed Habitat Challenge, a $2.5 million multi-phase competition designed to generate ideas and advance technology for the construction of sustainable housing solutions “for Earth and beyond.”
After printing three cylinder and three beams the first two levels of Phase 2, Stage 3 asked teams to design and print a 1.5-meter dome using indigenous Martian soil and recyclable materials, envisioning how future habitats could be constructed on the Red Planet. Teams were required to develop the 3-D printing technology itself as well as the structural design for each dome. The competition also dictated each structure be built within a 22-hour time frame, using the specific materials, geometric tolerances and autonomous performance that would be demanded by the Martian landscape.
Foster + Partners Awarded Top Prize in NASA’s 3D-Printed Mars Habitat Challenge
NASA has announced the completion of the initial printing stage of NASA’s 3D-Printed Habitat Challenge, awarding Foster + Partners | Branch Technology and the University of Alaska, Fairbanks as the two top-scoring teams from this round.
After Phase 1 of the competition (won by Clouds AO and SEArch) tasked architects and engineers from around the globe to imagine hypothetical concepts for the habitation of Mars, Phase 2 is challenging designers to manufacture actual, 3D-printed objects using techniques that could be employed to create shelters on a future mission to the red planet or beyond.