Steuerzentrale / Simon Freie Architekten BDA

Steuerzentrale / Simon Freie Architekten BDA - Interior Photography, FacadeSteuerzentrale / Simon Freie Architekten BDA - Interior Photography, FacadeSteuerzentrale / Simon Freie Architekten BDA - Interior PhotographySteuerzentrale / Simon Freie Architekten BDA - Interior PhotographySteuerzentrale / Simon Freie Architekten BDA - More Images+ 9

Sindelfingen, Germany
Steuerzentrale / Simon Freie Architekten BDA - Interior Photography, Facade
© Brigida Gonzalez

Text description provided by the architects. The new construction of the control building was built within the property of the Bundeswehr. The building is used to manage complex electronic systems and equipment on an adjacent shooting range. The plot is 10m wide and 56m long and surrounded by 15m high protective walls on three sides. These walls enclose two shooting lanes running in parallel to the sides. You can access the 6.5 m wide and 47.5 m long structure via a street that lies 3m below. A partial basement at street level contains the building services, battery, and UPS rooms.

Steuerzentrale / Simon Freie Architekten BDA - Interior Photography
© Brigida Gonzalez
Steuerzentrale / Simon Freie Architekten BDA - Image 12 of 14
Plan
Steuerzentrale / Simon Freie Architekten BDA - Interior Photography
© Brigida Gonzalez

To the side of the basement, there is an open-roofed staircase, which continues as a band as a roofed path on the upper level and inside the building as a single-level access corridor. The access band is underlined by lines of light incorporated in the concrete ceilings, which continue from the canopy above the stairs, over the cantilevered roof surface above the access path to the inner corridor.

Steuerzentrale / Simon Freie Architekten BDA - Interior Photography
© Brigida Gonzalez

A storage room with a folding door is attached to the access path on the upper level. Inside the building, the control room, an office, sanitary rooms, and a tea kitchen are accessed via the corridor. A server and IT room can be reached internally through the control room. Wall niches along the corridor are used as shelf space. The corridor leads into a meeting room whose lock to an open area marks the end of the access belt. Due to the cramped conditions of the construction site and the extremely high requirements from the structural noise protection, a construction method made of prefabricated concrete sandwich elements was chosen for the outer walls.

Steuerzentrale / Simon Freie Architekten BDA - Interior Photography
© Brigida Gonzalez
Steuerzentrale / Simon Freie Architekten BDA - Interior Photography, Windows
© Brigida Gonzalez

These consist of a 25 cm thick, load-bearing inner wall made of concrete with a smoothed interior view, an insulation layer made of 20 cm rock wool, and a facing layer made of 10 cm thick concrete with a visible, smooth surface. The standard formats of the wall elements are 2.50m (w) x 4.07m (h) x 0.50m (d). Vertically inserted strips at a distance of 1.25m visibly depict the building grid in the facing shell to the outside. Due to the high noise protection requirements, the number of window openings was reduced to a total of 7 double-shell box windows of the same size.

Steuerzentrale / Simon Freie Architekten BDA - Interior Photography, Facade
© Brigida Gonzalez

Project gallery

See allShow less

Project location

Address:71065 Sindelfingen, Germany

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Steuerzentrale / Simon Freie Architekten BDA" 12 Apr 2021. ArchDaily. Accessed . <https://www.archdaily.com/959835/steuerzentrale-simon-freie-architekten-bda> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.