![Freemen’s School Swimming Pool / Hawkins\Brown - Windows, Glass, Beam, Column](https://images.adsttc.com/media/images/5a33/32f3/b22e/3853/e200/004a/medium_jpg/171022_HB_Freemens_Pool_026.jpg?1513304807)
-
Architects: Hawkins\Brown
- Area: 1750 m²
- Year: 2017
-
Photographs:Jack Hobhouse
-
Manufacturers: AGROB BUCHTAL, Stora Enso, Glulam
-
Lead Architects: Adam Cossey, Oliver Milton, Harriet Redman, Chloe Marshall, Negar Mihanyar
![Freemen’s School Swimming Pool / Hawkins\Brown - Image 1 of 16](https://images.adsttc.com/media/images/5a33/336c/b22e/3853/e200/004e/newsletter/171022_HB_Freemens_Pool_046.jpg?1513304931)
Text description provided by the architects. The scheme designed by award-winning architects Hawkins\Brown provides a 25m, six lane competition pool, with changing facilities and a multi-purpose teaching and events space.
![](https://images.adsttc.com/media/images/5a33/32cc/b22e/3853/e200/0049/medium_jpg/FreemansSwimming_Pool-SitePlan_Media.jpg?1513304756)
The new pool uses state-0f-the-art timber construction and offsite fabrication methods to create a sustainable building that sits gently within its context. It replaces the school’s original pool building, which a fire destroyed in 2014. It also relocates it from the west to the east side of the campus, next to the existing sports facilities.
![Freemen’s School Swimming Pool / Hawkins\Brown - Facade](https://images.adsttc.com/media/images/5a33/3389/b22e/3866/6000/004d/newsletter/171022_HB_Freemens_Pool_052.jpg?1513304961)
The construction of the pool, led by UK construction and fit out contractor Gilbert-Ash, includes glue-laminated timber (glulam) portal frame, braced with cross-laminated timber (CLT) panels. The use of engineered timber provides a fast, efficient, carbon neutral method of construction that provides both structure and internal finish.
![Freemen’s School Swimming Pool / Hawkins\Brown - Image 3 of 16](https://images.adsttc.com/media/images/5a33/333c/b22e/3853/e200/004c/medium_jpg/171022_HB_Freemens_Pool_034_v2.jpg?1513304880)
![](https://images.adsttc.com/media/images/5a33/32e4/b22e/3866/6000/0049/newsletter/FreemansSwimmingPool_LowerGroundFloorPlan2.jpg?1513304785)
![Freemen’s School Swimming Pool / Hawkins\Brown - Lighting, Windows](https://images.adsttc.com/media/images/5a33/337f/b22e/3853/e200/004f/medium_jpg/171022_HB_Freemens_Pool_047.jpg?1513304946)
The all-timber construction also has a number of advantages in dealing with the challenges of a pool environment – it is resilient, a thermal insulator and corrosion resistant. On site, the erection of the glulam portal frame and cross-laminated timber walls and roof took just over three weeks. This allowed the detailed design and full construction of the building to be delivered in one year.
![](https://images.adsttc.com/media/images/5a33/3317/b22e/3853/e200/004b/newsletter/FreemansSwimmingPool_Section.jpg?1513304841)
The natural internal surface of the structural timber roof and walls is left exposed and stained white. This material acts as a complementary feature to the external setting and helps to create a special environment to swim in.
Within the pool hall the structurally expressive roof geometry is accentuated by a series of shifting glulam frames creating a visually dynamic space.
![Freemen’s School Swimming Pool / Hawkins\Brown - Windows, Facade, Glass, Column](https://images.adsttc.com/media/images/5a33/3305/b22e/3866/6000/004a/medium_jpg/171022_HB_Freemens_Pool_028.jpg?1513304825)
To minimise its impact on the school’s Grade II listed landscape, the swimming pool’s lower ground floor is partially submerged. This molds the structure into the surrounding scenery and preserves a large number of the existing trees. The highest point of the gently pitched roof identifies the main entrance.
![](https://images.adsttc.com/media/images/5a33/326e/b22e/3866/6000/0046/newsletter/_Punched_Windows.jpg?1513304658)
The swimming pool marks the second phase of a 4-stage masterplan by the City of London, which Hawkins\Brown is delivering for Freemen’s School in Ashtead, Surrey, with a view to improve the quality of the school’s listed campus setting.
![Freemen’s School Swimming Pool / Hawkins\Brown - Windows](https://images.adsttc.com/media/images/5a33/32b2/b22e/3866/6000/0048/medium_jpg/171022_HB_Freemens_Pool_016.jpg?1513304741)
Completed in 2014, the first phase saw the delivery of a new music school and a boarding house for 60 pupils. Future phases include the refurbishment of the Grade II* Listed Main House, a new playground and enhancements to the landscaping of the school grounds.
![Freemen’s School Swimming Pool / Hawkins\Brown - Image 5 of 16](https://images.adsttc.com/media/images/5a33/335e/b22e/3853/e200/004d/medium_jpg/171022_HB_Freemens_Pool_044.jpg?1513304913)