-
Architects: BBK Architekten
- Area: 3 m²
- Year: 2016
-
Photographs:Till Schuster
-
Manufacturers: Agglotech, Bosshard Farben, Vogt group
-
Electrical Project: CSN engineering, Norbert Foser
Text description provided by the architects. Originally built in 1975, Balzers Sports Hall is a large multifunctional Sports facility with three gymnasiums, multi-use axillary rooms, and an indoor swimming pool open to the public. The renovation of the interior included the renewal of old flooring, updating fire protection systems as well as reinforcement of the primary building structure due to local seismic activity. In addition to the interior renovations, a new timber facade was designed to encase the existing building envelope - adding additional insulation to meet current Minergie standards.
The rhythmic design of the vertical wooden facades break down the large volume of the complex and allows for transparency throughout the interior spaces. The pre-weathered gray cladding creates a dialogue to the already existing secondary school ‘Realschule'. As a part of a school complex, comprised of Kindergarten and a Secondary school, an expansion of the main entrance hall was created to connect the ‘Realschule' to the Sports hall.
The main entrance opens up into the central courtyard and plays a crucial role in the transitioning of spaces throughout the entire campus. As a major transit zone, the main entrance hall encompasses a large open staircase and elevator which connects all floors of the complex.