![Burntwood School / Allford Hall Monaghan Morris - Exterior Photography, Facade](https://images.adsttc.com/media/images/55c2/9224/e58e/ceb7/df00/0021/newsletter/portada_004_Rob_Parrish.jpg?1438814738)
-
Architects: Allford Hall Monaghan Morris
- Year: 2013
-
Photographs:Rob Parrish, Timothy Soar
-
Manufacturers: Aluk, KI Europe
-
Environmental Designer: Studio Myerscough, Morag Mysercough
![Burntwood School / Allford Hall Monaghan Morris - Exterior Photography, Windows, Facade](https://images.adsttc.com/media/images/55c2/94ef/e58e/ceb7/df00/002a/newsletter/014_Timothy_Soar.jpg?1438815452)
Text description provided by the architects. The transformation of Burntwood School pieces together a 1950’s modernist education campus for 2000 pupils and 200 staff in south-west London. Within an existing mature landscape, six new buildings-as-pavilions develop the heritage of the existing, orchestrating a system of bespoke constructional components to bring both efficiency and delight.
![Burntwood School / Allford Hall Monaghan Morris - Exterior Photography, Windows](https://images.adsttc.com/media/images/55c2/9392/e58e/ceb7/df00/0024/medium_jpg/008_Timothy_Soar.jpg?1438815091)
![Burntwood School / Allford Hall Monaghan Morris - Image 18 of 32](https://images.adsttc.com/media/images/55c2/95fc/e58e/ceb7/df00/0031/medium_jpg/floor_(4).jpg?1438815733)
![Burntwood School / Allford Hall Monaghan Morris - Interior Photography, Facade](https://images.adsttc.com/media/images/55c2/936d/e58e/cedb/2e00/001c/medium_jpg/007_Timothy_Soar.jpg?1438815056)
The new buildings – four 4-storey teaching pavilions, a new sports hall and a new performing arts building – are placed amongst a number of retained buildings (including two by Sir Leslie Martin) to form a complete and coherent campus, with lawns, squares and a central pedestrian spine. Within each pavilion, classrooms and ancillary accommodation are arranged along a central corridor with voids and double-height spaces at each end to increase natural daylight and make connections to the exterior.
![Burntwood School / Allford Hall Monaghan Morris - Interior Photography, Facade](https://images.adsttc.com/media/images/55c2/948a/e58e/ceb7/df00/0028/newsletter/012_Timothy_Soar.jpg?1438815343)
The regularity of each plan is followed through to the elevation with faceted precast concrete panels that correspond to a 7.5 metre structural and classroom module; a development of the prefabricated façade work seen at Dagenham Park Church of England School.
![Burntwood School / Allford Hall Monaghan Morris - Exterior Photography, Windows](https://images.adsttc.com/media/images/55c2/932a/e58e/cedb/2e00/001b/newsletter/006_Timothy_Soar.jpg?1438814994)
Originally published on August 07, 2015