Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Image 2 of 14Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - FacadeBuilding a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - HandrailBuilding a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - FacadeBuilding a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - More Images+ 9

Saint-Étienne-du-Rouvray, France
Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Facade
Courtesy of Christophe Bidaud Architecture

Text description provided by the architects. This mecca of operational research on the drivers of tomorrow (electric and hybrid) has an architecture draws its vocabulary in the automotive world. We imagined a long building that evokes the abstract body of a car.

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Facade, Windows
Courtesy of Christophe Bidaud Architecture

We wanted this new structure, located between Esigelec and Insa, a hyphen, it is visible while hiding.

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Image 2 of 14
Courtesy of Christophe Bidaud Architecture

To do this, the project reflects the wooded environment. The building is located behind a row of pines whose vertical slice with the horizontality of the structure.

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Image 14 of 14
Section AA

The facades are Corten steel, rusted steel that brings out the shimmering orange. Inside, the space is divided into three parts: a lab section, a large atrium on several levels and a workshop for advanced research.
The three areas still live with this search for balance between home and privacy.

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Facade
Courtesy of Christophe Bidaud Architecture

Specifications:

- Structure-walls mixed concrete floor to the lobby, rooms
   meeting and office space.

- Metal post and beam structure for research laboratories

- Shear walls stained concrete facade

- Envelope laboratory Corten

Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture - Handrail
Courtesy of Christophe Bidaud Architecture

Project gallery

See allShow less

Project location

Address:Saint-Étienne-du-Rouvray, France

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Building a Campus Integration of Embedded Systems / Christophe Bidaud Architecture" 28 Nov 2014. ArchDaily. Accessed . <https://www.archdaily.com/568432/building-a-campus-integration-of-embedded-systems-christophe-bidaud-architecture> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.