Data Centre In Cerdanyola / ACXT

Data Centre In Cerdanyola / ACXT - More Images+ 12

Cerdanyola del Vallès, Spain
  • Architects: IDOM
  • Area Area of this architecture project Area:  25000
  • Year Completion year of this architecture project Year:  2011
  • Project Management: Enrique Bolón
  • Structures: Gustavo Melón, Nuno Souza, Iván Florencia
  • Facilities: Oriol Passola, Marc Fandós
  • Site Supervision: Tono Fernández, Magdalena Ostornol, Jonathan García, Oriol Passola, Marc Fandos
  • Construction Management: Enrique Bolón, Gabriel Kososwski, Xavier Talló
  • Architect In Charge: Tono Fernández Usón
  • Team: Magdlena Ostornol, Fernando Rial, Elida Mosquera, Manuel Lópes Periquito
  • City: Cerdanyola del Vallès
  • Country: Spain
More SpecsLess Specs

Text description provided by the architects. The Data Centre program includes more than 6.000 m2 of processors distributed into 18 IT rooms as well as parking places, contingency offices, operation, coupling facilities, testing rooms, suppliers and workshops. The building typology requires the highest technological functionality, prioritizing: flexibility, scalability and energy efficiency in the three floors of computer rooms as well as in the two technical floors for the facilities of cooling and electric ones.

© Edouard Decam

The special location of the Technology Park, located in the middle of nature, invites to propose a performance based on the sensibility for the impact on nature, minimizing the excavation volume and the landmark. Both formally and functionally, the main difficulty is to enclose a 100x43 meters rectangle in a triangular site, including six IT rooms (12x29m) per floor. The offices area raises itself to create a garden-space in the ground floor that becomes the access to the Data Center. Located perpendicular to the technical area solves the main street needs.

© Edouard Decam

Technically, the facilities design gets a Tier III level of security and an energy efficiency by a PUE that does not exceed 1.8. The electric facilities project has been designed for 16MW total power and a security level of TIER IV (Uptime Institute). The implementation of the Data Centre will be developed in phases, with a IT initial capacity of 2.5 MW. In terms of physical Layout and room's topology the Data Centre based on the structure: aisle cold - aisle hot.

© Edouard Decam

The high density racks have liquid cooling systems in-row type. Reconciling these two wills -maximum functionality and minimal environmental impact- is the essential challenge of the project. The application of criteria and good practices of sustainable design have allowed the project is LEED certified.

Axon

Project gallery

See allShow less

Project location

Address:Avinguda Parc Tecnològic, 08290 Cerdanyola del Vallès, Barcelona, Spain

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Data Centre In Cerdanyola / ACXT" [Centro de Proceso de Datos en Cerdanyola del Vallès / ACXT] 10 Sep 2013. ArchDaily. Accessed . <https://www.archdaily.com/425659/data-centre-in-cerdanyola-acxt> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.