  • Design Team: Ian McDougall, Stephen Ashton, Howard Raggatt, Neil Masterton, Peter Bickle, Stephen Davies, Jonothan Cowle, Andrea Wilson, Rhonda Mitchell, Doug Dickson, William Pritchard, Paul Buckley, Justin Fagnani, Sarah Lake, Tom Denham, Matthew Ginnever, Allira Davies, Tim Brooks, Asako Miura, Andrew Lilleyman, Aaron Poupard, Andrew Ta, Deborah Rowe, Jason Lee, Ken Billan, Lee Lambrou, Mark Raggatt, Martine De Flander, Monique Brady, Mordechai Toor, Natalie Lysenko, Sarah Box, Simon Shiel, Tobi Pederson, Tom Marsh
  • Landscape Architecture: Taylor Cullity Lethlean
  • City: Melbourne
  • Country: Australia
More SpecsLess Specs
Hamer Hall / ARM Architecture - Image 8 of 32
© John Gollings

Text description provided by the architects. The underlying ideas behind the design come from the strength of the conflicting thematics by Roy Grounds and John Truscott. Our commission comprised a review of the master plan for the whole of the Arts Centre precinct its relationship to greater Southbank. Our mission, gradually refined through conflicts and agreements with the various client participants was to open up Hamer Hall, integrating it with the river and make it a 21st Century venue .Underlying our job was to repair its standing as a major civic building. The building represents two artistic discourses in Melbourne: the architectural story of the castle and the mine: the theatrical story of the palace and the cave of jewels. We took these two narratives, reinterpreted them and added our own voice to the story of Hamer Hall. The new riverside section is inspired by a new geometry.

Hamer Hall / ARM Architecture - Exterior Photography, Facade
© John Gollings

The redevelopment was approved by Heritage Victoria. Throughout the redevelopment we took great care to preserve many unique heritage aspects of the Hall, retaining Roy Grounds’ base architecture and as much as possible of John Truscott’s original interiors.

Hamer Hall / ARM Architecture - Image 10 of 32
© Peter Bennetts

The redevelopment repairs HH’s performance acoustics, to world standards, installs state of the art stage technology and back of house facilities. The patron amenity is completely redesigned, with increased foyer area, toilet numbers and lounges with exterior modifications that create a more outward facing venue to make it more accessible and inviting to the public.

Hamer Hall / ARM Architecture - Image 11 of 32
© Peter Bennetts

The existing built form of the drum has been retained but radical changes were made to the riverside section of the precinct. The new form draws its influences from Grounds’ muse, the Castel San Angelo, Rome. Built in off‐form concrete it recalls the rusticated base of the Roman ruin. The layout reinforces the existing ant tracks around the building.

Hamer Hall / ARM Architecture - Interior Photography
© John Gollings

Our commission was to rethink the master plan completed earlier by FJMT. The funding for the project had been primarily focused on high level ambitions for rebranding Hamer Hall and repairing theater technology and poor access. Quickly the team had honed in on the main programmatic challenges to be addressed. These included improved integration with the Hall’s surroundings, especially St Kilda Rd and River side, substantial Hall acoustic repair, substantial operating and technical improvements, a third revenue stream through new F&B spaces and improved patron amenity. While this was latent in the overall business case, it had never been defined physically or translated into a budget. We did that.

Hamer Hall / ARM Architecture - Interior Photography
© Peter Bennetts

ARM coordinated the design team which included Peter Elliott (Urban Design), TCL (Landscape), Kirkegaard Associatess and Marshall Day (acousticians), Aurecon (Services & Structure) and Shuler Shook (theatre designers).

Hamer Hall / ARM Architecture - Interior Photography
© John Gollings

The project was delivered through an Alliance contract, which means that the architects were an equal member of the project delivery team comprising Owner, Constructor and Designer. Hamer Hall reborn was delivered within the State’s target budget, and within the prescribed but unrealistically short time frame. Anecdotally, the scope and functionality has been achieved well beyond “business as usual” and the expectations of the client.

Hamer Hall / ARM Architecture - Image 26 of 32
Elevation

Project gallery

See allShow less

Project location

Address:Southbank VIC 3006 Australia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Hamer Hall / ARM Architecture" 22 Mar 2013. ArchDaily. Accessed . <https://www.archdaily.com/347581/hamer-hall-arm-architecture> ISSN 0719-8884

© John Gollings

墨尔本 哈默尔厅 / ARM建筑设计

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.