![Clarion Hotel Post / Semrén & Månsson - Windows, Facade](https://images.adsttc.com/media/images/50f9/c33c/b3fc/4b5b/1800/00e6/newsletter/SM_CLARION_HOTEL_POST_05.jpg?1414192397)
-
Architects: Semrén & Månsson
- Area: 34000 m²
- Year: 2012
-
Photographs:Krister Engström
-
Manufacturers: Aurubis
![Clarion Hotel Post / Semrén & Månsson - Windows, Facade](https://images.adsttc.com/media/images/50f9/c2ad/b3fc/4b5b/1800/00e2/newsletter/SM_CLARION_HOTEL_POST_02.jpg?1414192475)
Text description provided by the architects. The transformation of the Central Post Office into a world class hotel will in the future further develop the area around Drottningtorget in a very positive and substantial way. The project originated in a conversation with the construction company PEAB. At the time PEAB was assisting Choice Group in the establishment of a large new hotel in Gothenburg. When asked what would be the most suitable location, the answer was the Central Train Station area - "but there's nothing available."
![Clarion Hotel Post / Semrén & Månsson - Windows, Facade](https://images.adsttc.com/media/images/50f9/c305/b3fc/4b5b/1800/00e4/newsletter/SM_CLARION_HOTEL_POST_04.jpg?1414192466)
Semrén & Månsson was at the same time working with the downtown Hotel Avalon and up to date with all parameters that govern hotel projects. During a walking tour around the central station the true potential of the Central Post Office became evident. The existing building had a rhythm of windows suitable for a hotel and the existing infrastructure included a large yard with loading docks, a great asset for congress halls and also the possibility to add new building volumes to achieve the desired hotel facilities and total number of keys.
![Clarion Hotel Post / Semrén & Månsson - Facade](https://images.adsttc.com/media/images/50f9/c3b2/b3fc/4b5b/1800/00e9/newsletter/SM_CLARION_HOTEL_POST_08.jpg?1414192451)
At that moment we could not fully grasp the complexities of transforming a central mail facility into a modern hotel of international standard. Without an extremely good working relationship with the authorities including the offices for Real-estate and Development, Urban Transportation, City Planning, County Administrative Board and the National Heritage Board it would not have been possible to rebuild and add 10.000 m2 inside a national monument, thus implementing the project. Since the opening day, the reward in terms of popularity and attention give proof that the city really needed a gathering place in this most central location.
![](https://images.adsttc.com/media/images/50f9/c78c/b3fc/4b5b/1800/00f8/newsletter/second.jpg?1414192479)