Metal Recycling Plant / dekleva gregoric architects - Image 2 of 25Metal Recycling Plant / dekleva gregoric architects - FacadeMetal Recycling Plant / dekleva gregoric architects - FacadeMetal Recycling Plant / dekleva gregoric architects - Image 5 of 25Metal Recycling Plant / dekleva gregoric architects - More Images+ 20

Text description provided by the architects. What is long-lasting and what is recycle friendly was one of the key questions we were able to follow in the project for a metal recycle plant, where they first accumulate and then separate different waste metals and prepare them for reuse. The project consists of an immense production plateau and two small buildings on the edge of it.

Metal Recycling Plant / dekleva gregoric architects - Facade
© Matevz Paternoster

We clearly divided the generic base, flexible for multiple-use and the very specific, non-flexible, therefore ephemeral and recycle friendly by its activity. In these terms the huge concrete plateau with a definition wall and attached concrete service building define the core of the current production, however they easily allow for change of program within the industrial zone. This huge part of the project required careful placing of the plateau in the environment ensuring least earth works and lowest possible concrete wall.

Metal Recycling Plant / dekleva gregoric architects - Facade
© Miran Kambič

On the other hand, the small 100% metal office building works as a very specific control deck supervising the weighing of the incoming waste and out-coming metals. Since this specificity means non-adaptability we had to allow for easy and clear on-site recycling when this building is not needed anymore.

Metal Recycling Plant / dekleva gregoric architects - Beam
© Matevz Paternoster

In contrast to the very rough production that goes on at the site we have embedded some abstract or we like to think “poetic” content in the project. The two buildings are of the same volume, but materially very different: one is made entirely out of concrete, whereas the other is all steel – from structure to cladding. Thus the two buildings speak about the context of material separation process of the metal recycle plant.

Metal Recycling Plant / dekleva gregoric architects - Fence
© Matevz Paternoster

Project gallery

See allShow less

Project location

Address:Pivka, Slovenia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Metal Recycling Plant / dekleva gregoric architects" 21 Jan 2011. ArchDaily. Accessed . <https://www.archdaily.com/104797/metal-recycling-plant-dekleva-gregoric-arhitekti> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.