National Athletics Stadium Hungary / NAPUR Architect - Exterior Photography, Waterfront, Cityscape, Aerial View PhotographyNational Athletics Stadium Hungary / NAPUR Architect - Image 3 of 49National Athletics Stadium Hungary / NAPUR Architect - Image 4 of 49National Athletics Stadium Hungary / NAPUR Architect - Image 5 of 49National Athletics Stadium Hungary / NAPUR Architect - More Images+ 44

Budapest, Hungary
More SpecsLess Specs
National Athletics Stadium Hungary / NAPUR Architect - Image 5 of 49
© Tamás Bujnovszky

Text description provided by the architects. The National Athletics Stadium was established on behalf of the Hungarian State as the starting building for the long-term urban design of the Budapest South City Gate development. The stadium was designed by NAPUR Architect Kft., the winner of the design competition. The construction was carried out by the construction consortium ZÁÉV Zrt. – Magyar Építő Zrt.

National Athletics Stadium Hungary / NAPUR Architect - Image 9 of 49
© Molnár József
National Athletics Stadium Hungary / NAPUR Architect - Image 45 of 49
Plan - Public Terrace
National Athletics Stadium Hungary / NAPUR Architect - Image 11 of 49
© Tamás Bujnovszky

The main elements of the planning are the new Athletics Stadium and Park to be built on the site of the Vituki industrial site in Ferencváros, the planned new pedestrian-bicycle cable bridge connecting it to the summit of North Csepel, and the new Athletics Training Centre accessible through it. The three project elements together aim to help the development of the area with an urban design vision. The design of the building and its appearance were created in honor of the queen of sports, and athletics, therefore the architectural design of the stadium is an untouchable Antique classic white crown.

National Athletics Stadium Hungary / NAPUR Architect - Image 3 of 49
© Tamás Bujnovszky
National Athletics Stadium Hungary / NAPUR Architect - Image 47 of 49
Section
National Athletics Stadium Hungary / NAPUR Architect - Image 4 of 49
© Molnár József

In accordance with sustainability aspects, the project was implemented by eliminating the brownfield industrial areas of the southern Danube bank of Budapest and by rehabilitating its entire 20-hectare area. The goal was to create a new, open sports and recreational multipurpose athletics stadium and public park for sports enthusiasts and city dwellers who want to relax. In the center of the park, the building of the Athletics Stadium was built in competitive mode for the 2023 World Athletics Championships in Budapest with a capacity of 35,000 people. After the World Championships, the basic mode design of the Athletics Stadium building was completed in 2024. The temporary upper stands of the stadium were removed and replaced by a 15,000 square meter covered open and illuminated leisure park called the "Open City Ring", on which a running track, family jogging track, streetworkout, training area and street food service were created. The goal was to create a stadium with a large capacity for World Championships, but in subsequent periods as open as possible for mass sports and athletics youth in a way accessible to everyone 365 days a year.

National Athletics Stadium Hungary / NAPUR Architect - Image 6 of 49
Section Diagram

The presented building is the first "Open Arena" in the world to achieve this. In September 2024, the first open program was held in the building, where the "Open City Ring" leisure park was presented as a new recreational place for Budapest.

National Athletics Stadium Hungary / NAPUR Architect - Image 22 of 49
© Molnár József
National Athletics Stadium Hungary / NAPUR Architect - Image 20 of 49
© Molnár József

In the entire development area surrounding the stadium, from the Rákóczi Bridge to the Kvassay lock and through the new cable bridge all the way to North Csepel a new flood defense, coastal pedestrian walkways, bicycle paths and boat stations were built. With the development, pedestrian, cycling and water connections of the northern and southern areas of the entire Pest quay were realized to the southern part of the city. The aim was to create an attractive recreational neighborhood for city dwellers that could become part of the ecological network of the EU and Hungary. The sustainability of the new "Green" investment is built on maximum sustainable foundations thanks to its continuous use as a multipurpose event area and its renewable geothermal energy system. In terms of reducing environmental impact, instead of car traffic, public transport solutions and pedestrian cycling are systematically preferred. The structural supporting structure of the stadium is a unique stretched roof structure made with optimized steel consumption, only functionally most important areas of the building's interiors are heated in the order of 10% of the total floor area. Taking these sustainability aspects into account, the new "Open Arena" in Budapest was designed by NAPUR Architect Kft. in 2024 taking into account both engineering, construction and operational aspects.

National Athletics Stadium Hungary / NAPUR Architect - Exterior Photography
© Tamás Bujnovszky

Project gallery

See allShow less

Project location

Address:Budapest, Hungary

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "National Athletics Stadium Hungary / NAPUR Architect" 12 Dec 2024. ArchDaily. Accessed . <https://www.archdaily.com/1024673/national-athletics-stadium-hungary-napur-architect> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.