Sarv Office Building / Tamouz Architecture & Construction Group

Sarv Office Building / Tamouz Architecture & Construction Group - Exterior Photography, WindowsSarv Office Building / Tamouz Architecture & Construction Group - Exterior Photography, FacadeSarv Office Building / Tamouz Architecture & Construction Group - Interior Photography, Fence, ColumnSarv Office Building / Tamouz Architecture & Construction Group - Image 5 of 17Sarv Office Building / Tamouz Architecture & Construction Group - More Images+ 12

  • Lead Team: Hooman Tahamtanzadeh, Marjan Banaei, Hossein, Salavaty Khoshghalb
  • Design Team: Babak Abdolghafari
  • Structural Consultants: Alcam Vista
  • City: Tehran
  • Country: Iran
More SpecsLess Specs
Sarv Office Building / Tamouz Architecture & Construction Group - Image 6 of 17
© Mohammad Hassan Ettefagh

Disorder/Order – Scattered/Arranged – Unorganized/Organized – Not seeing/Seeing – Unseen/Seen – Shade/Light – Closed/Open – Shell/Space. These opposing concepts were central to the design challenges faced by the Sarv administrative building project. Initially referred to the design team in June 2017 for façade approval, the building posed unique architectural problems. It was a partially constructed structure with 100% plot coverage, limiting the potential for natural light and ventilation to just one side—the southern façade. This constraint heavily influenced the design team's approach, as they sought to balance functional requirements with aesthetic and spatial considerations.

Sarv Office Building / Tamouz Architecture & Construction Group - Exterior Photography, Facade
© Mohammad Hassan Ettefagh
Sarv Office Building / Tamouz Architecture & Construction Group - Image 5 of 17
© Mohammad Hassan Ettefagh

Given the building's initial form, it became clear that the façade needed more depth. A simple, flat surface would not suffice. Instead, the façade had to evolve from a mere protective "shell" into an intermediate space that not only framed the building but actively engaged with its surroundings. The southern side presented a complex challenge: it needed to be semi-open, allowing natural light to penetrate deep into the interior while shielding the space from harsh, direct sunlight. Moreover, it had to strike a balance between openness and privacy—transparent enough to connect the building with the outside world, yet closed enough to provide a sense of enclosure and security. This duality was key: a space that could "see" the outside but remain "unseen" from within, creating a dynamic interaction between the interior and exterior.

Sarv Office Building / Tamouz Architecture & Construction Group - Image 9 of 17
© Mohammad Hassan Ettefagh
Sarv Office Building / Tamouz Architecture & Construction Group - Image 16 of 17
Plan - Roof
Sarv Office Building / Tamouz Architecture & Construction Group - Exterior Photography
© Mohammad Hassan Ettefagh
Sarv Office Building / Tamouz Architecture & Construction Group - Image 8 of 17
© Mohammad Hassan Ettefagh

To achieve this, the boundary between the building and the city was defined by two distinct layers. The first, closer to the interior, consisted of large, transparent windows that allowed natural light to flood the space, enhancing visibility and openness. The second, external layer was semi-transparent, composed of wooden railings and steel planters, forming a permeable screen. This outer layer acted as a filter, regulating light and airflow while providing a sense of privacy for the occupants. The space between these two layers became an active zone—partially open, serving both functional and aesthetic purposes, and softening the transition between the building and its urban environment.

Sarv Office Building / Tamouz Architecture & Construction Group - Interior Photography, Fence, Column
© Mohammad Hassan Ettefagh
Sarv Office Building / Tamouz Architecture & Construction Group - Image 14 of 17
Plan - Typical 1st, 3rd and 5th Floor

This design language was extended to the rooftop, continuing the concept of layered transparency and semi-transparency. The rooftop was not merely a functional space but an integral part of the building's interaction with the city, offering views, light, and air while maintaining a degree of seclusion.

Sarv Office Building / Tamouz Architecture & Construction Group - Image 13 of 17
© Mohammad Hassan Ettefagh
Sarv Office Building / Tamouz Architecture & Construction Group - Image 17 of 17
Wall Section

The careful organization of the façade and rooftop extended into the building's interior design. The arrangement of service zones, common areas, and mechanical and electrical systems followed the same principles of layering, openness, and controlled interaction with the environment. Each element was deliberately integrated to create a cohesive whole—an architectural response that balanced contrasts and reconciled opposing forces within a unified design.

Sarv Office Building / Tamouz Architecture & Construction Group - Exterior Photography, Windows
© Mohammad Hassan Ettefagh

Project gallery

See allShow less

Project location

Address:Tehran, Iran

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Sarv Office Building / Tamouz Architecture & Construction Group" 22 Oct 2024. ArchDaily. Accessed . <https://www.archdaily.com/1022625/sarv-office-building-tamouz-architecture-and-construction-group> ISSN 0719-8884

You've started following your first account!

Did you know?

You'll now receive updates based on what you follow! Personalize your stream and start following your favorite authors, offices and users.