Wall Partition System in Admin Building | feco
  1. ArchDaily
  2. Products
  3. Partitions
  4. Wall Partition System in Admin Building

Wall Partition System in Admin Building | feco

  • Available in

  • Use

    Interior wall partition system
  • Applications

    Administration building, office space
  • Characteristics

    Highly transparent, minimal sized frames, single or double glazing, Frameless design, all glass system, acoustic insulation, aluminium profile

2 General Catalogs

By downloading any file you agree to the Terms of Use, Privacy Policy and to the communication of your data to the brand from which you download catalogs and files.
The product has been saved to the folder: My Downloaded Products
feco Logo

Contact manufacturer

feco

feco Logo

Contact manufacturer

feco

More from feco

Website Phone

More about this product

The feco system was used in the new administration building for the Südwestmetall Neckar-Fils district group. The building has been built as a transparent, open meeting point for the members of the association on a site located between a busy road, railway line, and vineyards. Consultations, seminars, workshops, and conferences all take place here.

Spatial Design

The individual floor plans, which differ from floor to floor, are layered on top of each other in a staggered manner. This flowing spatial impression can be experienced thanks to the large air space above all floors. The glass office corridor walls follow the facade and are partly rounded. The fecoplan all-glass construction allows nature to work its way into the interior of the building. The doors are designed as dark wall panels with flush wooden door leaves and concealed frames on the corridor side.

undefined

With the fecowand office partition walls and the transparent glass fins on the corridor glass wall and the facade, the high quality of workmanship is also evident in the offices. Above the fecotür wood H70 elements, fecoair overflow elements contribute to the heating and cooling concept with concrete core temperature-controlled ceilings, heat pump, and mechanical displacement ventilation.

Project Details

Project Association of the Metal and Electrical Industry Baden-Wurttemberg
Location Esslingen, Germany
Year 2016
Products fecoplan, fecowand, fecoair, fecotür
Architect [fritzen 28] architekten, Esslingen
Property Owner/Client Südwestmetall, Bezirksgruppe Neckar-Fils
Photographer Nikolay Kazakov

Latest Catalogs and Files

By downloading any file you agree to the Terms of Use, Privacy Policy and to the communication of your data to the brand from which you download catalogs and files.
See All
feco Logo

Contact manufacturer

feco

feco Logo

Contact manufacturer

feco

More from

feco

Website Phone

Contact manufacturer

feco Logo

Contact manufacturer

feco

Related Products

View more related products »
Wall Partition System in Tertiary School

Wall Partition System in Tertiary School

feco
Wall Partition System in Stadtwerke Karlsruhe HQ

Wall Partition System in Stadtwerke Karlsruhe HQ

feco
Contact us