As every professional in the building industry knows, construction can be a costly and endlessly time-consuming endeavor. Delays are almost more frequent than on-time construction, and can be induced by extensive bureaucratic requirements, weather and other unexpected circumstances, inadequate planning, too few personnel, or a whole host of other causes. Lengthy construction projects can also negatively impact public perception of a project even before it has been built, especially if the projects experience delays or inconvenience those who live or work close to the building site. Moreover, some projects simply need to be built along a faster timeline than is typically feasible for a traditional construction project. Thankfully, there exists a solution for those seeking to drastically reduce construction times: modular construction.
The Library / A Work of Substance
-
Architects: A Work of Substance
- Area: 6120 ft²
- Year: 2021
-
Professionals: A Work of Substance
https://www.archdaily.com/976690/the-library-a-work-of-substanceHana Abdel
Goodman Westlink / A Work of Substance
-
Architects: A Work of Substance
- Area: 192 m²
- Year: 2019
https://www.archdaily.com/930209/goodman-westlink-a-work-of-substancePilar Caballero
KHROMIS Eyewear / A Work of Substance
-
Architects: A Work of Substance
- Area: 812 ft²
- Year: 2018
https://www.archdaily.com/896787/khromis-eyewear-a-work-of-substanceDaniel Tapia
The Fleming Hotel / A Work of Substance
-
Architects: A Work of Substance
- Area: 3382 m²
- Year: 2017
-
Manufacturers: Bolon, Ibuku Bali, MIDDLE EARTH, Topworlds
https://www.archdaily.com/883596/the-fleming-hotel-a-work-of-substance舒岳康 - SHU Yuekang