Constructing The Floating Piers: How the Last Great Work of Christo and Jean-Claude was Built

March 2016: Commercial divers from France are hired to install the underwater anchors at depths up to 90 meters. Image © Wolfgang Volz

12 / 31
Share Share
Save image