Constructing The Floating Piers: How the Last Great Work of Christo and Jean-Claude was Built

January 2016: At a factory in Fondotoce at Lago Maggiore, 200,000 high-density polyethylene cubes are manufactured over a period of eight months before delivery to the work site in Montecolino. Image © Wolfgang Volz

8 / 31
Share Share
Save image